Red Flags in a Biomass Feasibility Study

Red Flags in a Biomass Feasibility Study

How to tell whether a study you have been handed is strong enough to rely on.

Fuel assumptions without evidence

Be wary of fuel quantities taken from national statistics without local verification, a single fuel sample, or a delivered cost that ignores collection and storage losses. Good studies show where the numbers came from and how they were checked.

Technology chosen before the fuel was tested

If the study names a technology supplier on page one but the fuel analysis is in an appendix, the order may have been reversed. The fuel should drive the technology choice, not the other way round.

Availability that is too good

Biomass plants need regular maintenance and suffer from fuel-related outages, especially in their first years. Very high availability assumptions, with no ramp-up period, flatter the economics.

A single financial case

A model with no sensitivities, or sensitivities that move one input at a time by small amounts, hides risk. Look for combined downside cases and a clear statement of the break-even fuel cost and power price.

Grid and permits treated as formalities

If the study says the connection and permits “will be obtained” without evidence of contact with the authorities, the schedule is probably optimistic.

No view on operations

Staffing, training, spares and fuel quality control should be addressed. A plant that cannot be operated well will not deliver the model’s numbers.

Getting a second opinion

An independent review by engineers who build and run power plants can confirm a study’s conclusions or reveal what needs more work before money is committed. See our guide to the full scope of a feasibility study.

Review FAQs

Can USP&E review a study prepared by someone else?

Yes. Our engineers can review the technical basis and identify gaps or risks.

What should a review cost relative to the study?

It is usually a fraction of the original study, focused on the inputs that drive the decision.

Request a study review

Send the study and your questions, and we will tell you where it stands.

Discuss your study View USP&E equipment

Fuel, technology, grid and finance tested before a biomass plant is built.